Location

Why Vietnam, and why Gia Lai

Vietnam's demand for computing is growing fast, and its laws now treat data centers as a priority sector. Within Vietnam, Gia Lai pairs a large renewable power base with two international submarine cables that land at Quy Nhơn.

Vietnam

A growing market, with the law behind it

01

Demand

A fast-growing digital economy

US$39B+17% in 2025 · 81% use AI daily

Vietnam's digital economy was estimated at US$39 billion in gross merchandise value in 2025, up 17% on the year. Vietnamese users also lead Southeast Asia in daily use of AI tools, at 81%.[1]

02

Law

Data centers are a priority sector

71/2025/QH15In force since 1 Jan 2026

The Law on Digital Technology Industry (No. 71/2025/QH15), in force since 1 January 2026, lists data centers and AI among the priority sectors for investment incentives.[2]

03

Data

Some data must stay in Vietnam

53/2022/NĐ-CPIn force since Oct 2022

Since October 2022, Decree 53/2022/NĐ-CP has required domestic companies, and foreign providers in certain cases, to store specified user data in Vietnam.[3]

04

Connectivity

More international cables on the way

15+cables by 2030 · 350+ Tbps

Vietnam's strategy for its international cable system targets at least 10 new submarine cables by 2030, for a total of at least 15 and at least 350 Tbps of capacity.[4]

Gia Lai

From the highlands to the sea

Since its 2025 merger with Bình Định, Gia Lai runs from the Central Highlands to the coast, with its administrative center at Quy Nhơn.[5]

Section A–A · west to eastSchematic west-to-east section of Gia Lai: generation on the highland plateau, transmission lines down through the mountain pass, and cable landings on the coast at Quy Nhơn.

HighlandsHydropower, wind and solar plants across the plateau.

Mountain passTransmission lines carry power down to the coast.

Coast · Quy NhơnGrid, port and the ADC and SJC2 cable landings.

Section A–A · west to eastSchematic, not to scale

01

Power

A large renewable power base

85 renewable plants are operating in the province, with 4,179 MW of capacity. Together they supply more than 15 billion kWh a year to the national grid, and the adjusted national power plan takes the province's renewable capacity to about 9,657 MW by 2035.[6]

Renewable plants in operation, MW
  1. 2,516 hydro
  2. 1,048 wind
  3. 485 solar
  4. 130 biomass

02

Connectivity

Two international cables land at Quy Nhơn

ADC · SJC204/2025 · 07/2025

ADC, operated in Vietnam by Viettel, entered service in April 2025. SJC2, with VNPT as its Vietnamese partner, went live in July 2025; its main trunk links Singapore, Hong Kong, China and Japan.[7][8][9]

03

Policy

A province that wants this industry

AI · data centersPriority sectors for investment

Gia Lai lists digital technology, AI and data centers among the priority sectors in its investment promotion.[10]

Where PIDC fits

Power and cables, one site

PIDC's site is in coastal Gia Lai, beside the 220 kV transmission grid and within reach of both cable landing stations. Site details are shared under NDA.

Schematic location map — PIDC site in Gia Lai, 220 kV grid link, dual fiber routes to ADC and SJC2 landings at Quy Nhơn (LM-01)Schematic location map. Central Vietnam, with the PIDC site in Gia Lai province, a 220 kV grid connection, and two separate fiber routes east to the ADC and SJC2 cable landing stations at Quy Nhơn on the coast.VIETNAM220 kV gridGia Lai ProvincePIDC siteQuy NhơnADC landingSJC2 landingEAST SEASchematic location map, mobile — PIDC site in Gia Lai, 220 kV grid link, fiber routes to ADC and SJC2 landings at Quy Nhơn (LM-01)Schematic location map (mobile). Central Vietnam, with the PIDC site in Gia Lai province, a 220 kV grid connection, and two separate fiber routes east to the ADC and SJC2 cable landing stations at Quy Nhơn on the coast.220 kVPIDC siteQuy NhơnADCSJC2
Schematic location mapNot to scale

Talk to us about the campus