What is an AI data center?
An AI data center is a building, or a campus of buildings, designed to power and cool large clusters of GPUs and other AI chips. It does the same basic job as any data center, with far more power and heat packed into the same space.
- Compute trays: GPUs on cold plates
- Switch trays that link the GPUs
- Power shelves
- Coolant supply and return
What it does
Training and inference
Training
Thousands of GPUs work together for weeks or months to build an AI model from large amounts of data. They must sit close together on very fast networks, so training favors large, dense sites.
Inference
Running a trained model to answer requests, from chat assistants to image recognition. Inference runs around the clock and grows with the number of users, so it also needs good connections to the networks those users are on.
How it differs
The same kind of building, at many times the power
One current-generation GPU rack draws about 16 times the power of an average rack today. That changes the electrical supply and the cooling around it.
| Feature | Conventional data center | AI data center |
|---|---|---|
| Main hardware | CPU servers and storage | GPU servers linked into large clusters |
| Power per rack | Mostly under 10 kW | Tens of kW; about 130 kW for the newest GPU racks |
| Cooling | Mostly air | Liquid piped to the chips, with air for the rest of the room |
| Network | Built for traffic to and from users | Very fast links between GPUs inside the cluster, plus links out to users and clouds |
| Campus size | A few MW to tens of MW | Tens to hundreds of MW |
| Grid connection | Medium voltage or 110 kV | High voltage, often 110–220 kV or above |
Power
Why power decides where they are built
Data centers used about 415 TWh of electricity in 2024, around 1.5% of the world's total. The International Energy Agency expects that to more than double, to about 945 TWh by 2030, with AI the main driver.[3]
So the first question for any AI campus is power: a high-voltage grid connection with capacity to spare, room to add more over time, and supply that holds up around the clock. Land, buildings and equipment can be arranged. A new high-voltage connection can take years.
That is why PIDC chose a site beside the 220 kV grid.See the site
Cooling
Cooling and water
GPU racks give off too much heat for air alone. Current-generation systems such as the GB200 NVL72 are liquid-cooled: coolant flows through cold plates mounted on the chips and carries the heat away.[2]
- Cool coolant
- Warm coolant
Outdoors, that heat is released through dry coolers, cooling towers or a mix of the two. Closed-loop designs recirculate the same coolant and use little water. Evaporative designs use more water but less electricity. The right balance depends on the local climate and water supply.
Efficiency is measured as PUE, power usage effectiveness: the facility's total power divided by the power used by the computing equipment. A PUE of 1.0 would mean no overhead at all. The industry average was 1.56 in 2024.[1]
- Computing equipment
- Cooling and other overhead
For the province
What a campus brings to a province
- Large investment in buildings, electrical and cooling systems, and fiber.
- A steady local buyer for power generated in the province.
- Skilled jobs in electrical, mechanical and network engineering and in operations. Data centers employ fewer people than factories of similar cost, but the work is technical.
- New power and fiber infrastructure that other digital businesses can build on.
Terms
Terms you will hear
- GPU
- Graphics processing unit: the chip that does most AI computing.
- Rack
- A standard cabinet that holds servers. Power density is usually counted per rack.
- MW IT
- Power available to the computing equipment itself, not counting cooling and losses. Data center size is usually quoted this way.
- PUE
- Power usage effectiveness: total facility power divided by IT power. Lower is better.
- Liquid cooling
- Coolant piped to plates on the chips, which removes heat far better than air.
- Colocation
- Renting space, power and cooling to a customer who brings its own servers.
- Hyperscaler
- A very large cloud provider that runs its own fleet of data centers worldwide.
- Redundancy (N+1, 2N)
- Spare capacity so one failure does not stop service. N+1 adds one spare unit; 2N duplicates the whole system.
- Latency
- The time data takes to cross a network, measured in milliseconds.
- Cable landing station
- Where a submarine fiber cable comes ashore and joins land networks.
Sources
Where the numbers come from
- Uptime Institute, Global Data Center Survey 2024 (rack density, PUE).
- Supermicro, SRS-GB200-NVL72 rack specification (132 kW, 72 GPUs, direct liquid cooling).
- International Energy Agency, Energy and AI: Executive summary (2025).